LOCATION
Ahmed Hassan Al Marhoon & Bros Ready-mix is located in Ras Tanurah Industrial Area. Departments such as Management, Personnel, Sales, QA/QC & Operations are located in same place whereas workshop & stores are located in Um Al Sahik.
It is strategically located in Rahima (industrial area), catering for the supply of ARAMCO, SCECO, Port, Local requirements Of Ras Tanurah and within a 60 km radius.
COMPUTER BATCHING AUTOMATION
The batching plants are equipped with command alkon (fully automatic) computer automation system with independent display of weight scales calibrated by ARAMCO Certified agency.
ICE PRODUCTION PLANT
Our plant is equipped with own ice plant(Snow Key) , with production capacity of 25 Tons/day and equipped with a separate 30,000 kg capacity ice storage container.
Water Chilling Plant
Along with ice plant (Snow Key), our ready mix is also equipped with one water chiller which is capable of cooling from 60˚ C 120000 liters feed water to a final temperature of 0.5˚ C per day.
Aggregate Washing Plant
There is one aggregate washing plant with a production capacity of 30m³/hour. Aggregates are washed with water having a TDS of 1800-2000 ppm which is checked daily by our Q/C technicians prior to production consumption.
LABORATORY APPARATUS
Fresh Concrete Testing:
Item No. | Item Description | No. of Units | Remarks |
1 | 150 mm Cylinder Moulds | 45 | Sampling |
2 | 150 ×150 mm cube Moulds | 20 | Sampling |
3 | Slump Cone with accessories | 4 | Slump Testing |
4 | Air Meter | 1 | Air Content |
5 | Dial Concrete Thermometer | 3 | Temperature |
6 | Digital Concrete Thermometer | 2 | Temperature |
Hardened Concrete Testing:
Item No. | Item Description | No. of Units | Remarks |
1 | Temperature Controlled Curing Tank | 1 | Sample Curing |
2 | Compression Machine | 2 | Strength |
3 | Automatic Sulfur Melting Pot | 1 | Capping |
4 | Electronic Weigh Scale | 2 | Unit Weight |
Aggregate Testing
Item No. | Item Description | No. of Units | Remarks |
1 | Controls Oven | 1 | Oven Drying |
2 | Sieve Sets | 2 | Gradation |
3 | Sieve Shaker | 1 | Sieve Analysis |
4 | Specific Gravity Frame | 1 | Specific Gravity |
5 | Unit Weight Mold | 1 | Unit Weight |
6 | Beam balance | 2 | Weight |
Water and Temperature Testing
Item No. | Item Description | No. of Units | Remarks |
1 | TDS Meter | 1 | Water TDS |
2 | PH Meter | 2 | Water PH |
3 | Min/Max Thermometer | 2 | Ambient Temperature |
4 | Dial Thermometer | 3 | Water tanks |
HOT WEATHER CONCRETING
To meet the required concrete temperature of fresh concrete during ‘Hot Weather Concreting’, as per ACI 305-5.13.The following support facilities are adopted & considered to reduce the temperature of fresh concrete. The temperature of fresh mixed concrete should not exceed 32 degrees and we shall take all necessary precaution to ensure that this limit is not exceeded. Concrete with a temperature less than 32 degrees will be produced by combinations of the following methods. The support facilities (erected on the plant) are as follows:
As part of these precautions, extra efforts have been made to keep the concrete temperature as low as possible within considerable limits. For maximum effectiveness, the ice should not be allowed to melt before it is placed in the central mixer and in contact with other raw materials but it should melt completely prior to the completion of mixing of the concrete. All procedures mentioned above are implemented.
Technical Data